South Carlton

Solar Farm

Providing Clean Energy for West Lindsey

Enviromena has submitted a planning application to West Lindsey District Council for a solar farm located on land near South Carlton Farm, South Carlton, Lincoln, LN1 2RJ. 

The planning application has been validated and has been given the following planning reference number: P/2025/00663. The application can be accessed here.

The proposed solar farm will have a capacity of 29MW. The solar farm will create enough clean, renewable energy to power approximately 17,100 homes per annum. The solar farm would avoid 9,560 tonnes of CO2e annually (compared to other non-renewable forms of energy generation), which is the equivalent of taking 6,858 cars off the road each year.

Where is the proposed site?

The Benefits

  • The solar farm will assist West Lindsey District Council in reducing greenhouse gas emissions in line with national and local targets in response to the Climate Emergency.

  • The project will deliver net beneficial gains for biodiversity. Solar farm installations have a small footprint on the land they occupy, leaving considerable scope for biodiversity enhancements. Research has shown that responsibly managed solar farms can play an important role in reducing the decline in biodiversity.

  • Existing trees and hedgerows will be retained and protected and supplemented by additional native species planting to support local habitats as part of a wider ecological network.

  • The development of green projects like South Carlton Solar Farm also create business opportunities and economic activity which contribute to the country’s green recovery.

  • We are committed to using local suppliers and contractors during construction and long-term operation of the project, which will benefit the local economy, and provide jobs to people in the local area. 

  • The proposal does not require the stopping or diversion of any public rights of way.

  • The project connects to the local distribution network within the land, eliminating the need for off-site cable routing.

  • This is a temporary development, allowing the land to rest for the period of operation up to 40 years. Decommissioning and full restoration of the site at the end of life of the development will be secured via planning condition.

  • The project does not require Government subsidies.

About Us

Enviromena, the developer of this project, is a clean energy solutions company providing safe, affordable, and reliable solutions for growing sustainable power demands. Headquartered in the UK, Enviromena has more than 17 years’ global experience in developing, designing, constructing, managing, and operating ground-breaking renewable energy projects.

Enviromena have installed over 17,000 power systems globally and currently manages, operates, and maintains over 300 megawatts (MW) of renewable energy assets including solar and energy storage projects. Additionally, Enviromena currently has a further 3GW in construction and development across the UK and Italy.

Construction Route

Construction vehicles will access the site via Riseholme Road from the A46/A15, traveling south to the roundabout at the junction with the B1273.

From there, they will take the third exit onto Yarborough Crescent, heading west before traveling north along Burton Road. Upon reaching the junction with Fen Lane, vehicles will turn left and continue along Fen Lane until reaching the site access.

The same route will be used for egress, ensuring a consistent and manageable traffic flow. This route has been specifically chosen as a 16.5m articulated vehicle cannot turn right onto Fen Lane from Middle Street, making access from the north unfeasible for construction traffic.

A Transport Note will be prepared, including the proposed access route, to accompany the planning application and a full Construction Traffic Management Plan (CTMP) will be put in place prior to the commencement of the project.

FAQ

Public Consultation Event

We held a public consultation event on Wednesday 9th April 2025 at St John The Baptist Church, South Carlton, Lincoln, LN1 2RN.

Please find the boards that were presented at the event here.

UK 2025 Solar Roadmap

The UK Government recently released the Solar Roadmap, outlining its strategy to deliver clean energy by 2030. Appendix 2 addresses common misconceptions about solar power in the UK. The following are key frequently asked questions sourced directly from the roadmap.

Contact Us

If you wish to contact us or require further information, please feel free to use the form (situated to the right) or by the following methods:

Email adress: feedback@alpacacommunications.com

Freepost: ALPACA COMMUNICATIONS LTD